Space Number:  131

Area: South  

 

Within Building Number:  

 

Phasing:
Mellaart Level: Unassigned at present 

Hodder Level: South.T 

Additional Phase Info: Main spine. This space is part of the stratigraphic spine that forms the dating project sequence. The spine has been derived by direct stratigraphic relations as far as possible but does include some abutting relationships. Space 131 is the sequence of midden lying to the south of B.10 and therefore postdates the construction of B.10 and is probably contemporary with it's use. Space 131 lies below + (erosion and topsoil) and above midden space 129. It is likely contemporary to midden Space 119 that lies to the east of B.10 NB/Work in progress. Correct as of date entered or modified. 

 

Description:
Allocated 2009 to space south of Building 10 

 

Number of Related Diary Entries: 0

Conservation Recorded: No

Feature Numbers Related to this Space: (Click to view the record)

2607 (fire installation)
2608 (wall)
 
2612 (wall)
 
 
No. Of Units in this Space: 5  (Click to view unit list)

<< BackDownload this Spaces Data

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell