Space Number:  187

Area: NORTH  

 

Within Building Number: 1 

 

Phasing:
Mellaart Level: Unassigned at present 

Hodder Level: North.G 

Additional Phase Info: ?G. Excavated in isolation B.1 is currently not stratigraphically linked to any surrounding structures but poss related to central group of related buildings The current Hodder phasing for B.1 has been determined on it’s horizontal location within the 4040 Area structures only and therefore prefixed with “?”. The phase has been introduced to allow some cross query and can change according to analyses results. Prior to the introduction of the Hodder phases B.1 had been allocated to Mellaart Level VI – VII based on the material assemblage and in comparison to B.3 and B.5 but Mellaart levels of buildings/spaces NOT excavated in the 1960s have been removed to allow an independent assessment on phasing. NB/Work in progress. Correct as of date entered or modified. 

 

Description:
Created in post-ex 2000
South-western part of Building 1, originally excavated as space 70. Reassessment of wall F.15 and other factors meant that it seemed wisest to subdivide space 70 into two parts, 186 and 187.
Phases: B1.1B to B1.5A
DEFINITION
To North: wall F.15
To South: wall F.4/6
To West: wall F.2
To East: wall F.3
Mellaart Level estimate: Level VI-V (CC 2000) 

 

Number of Related Diary Entries: 0

Conservation Recorded: No

Feature Numbers Related to this Space: (Click to view the record)

2 (wall)
3 (bin)
4 (bin)
11 (fire installation)
15 (wall)
16 (grinding instalation)
 
21 (wall)
33 (fire installation)
34 (basin)
100 (wall)
201 (blocking)
 
359 (fire installation)
360 (fire installation)
374 (access hole)
 
No. Of Units in this Space: 113  (Click to view unit list)