Space Number:  208

Area: South  

 

Within Building Number: 92 

 

Phasing:
Interpreted Mellaart Level: VII 

Hodder Level: South.?M 

Additional Phase Info: The “?” indicates that it is not part of the direct stratigraphic Hodder sequence. As a result its relationship in the Hodder phasing is determined by a series of abuttments and by taking into account its location in the Mellaart levels. Correlated to house E.VII.18, overlies Space 384. NB/Work in progress. Correct as of date entered or modified. 

 

Description:
Shelter foundation excavations 2002.
C. centre north stretch.
Equiv Mellaarts House 18, Level VII

the FT cuts through the southern portion of the house excavated as Building 92 defining two rooms Space 208 represents the larger room and Space 210 the smaller side room to the west.was excavated by Mellart. The level documented is that of the earliest floor, that was left in patches by the Mellart team. Hence no internal phasing could be devised.

However, the plan provided by Mellart can be used to clarify some of the enigmatic spots of the building, such as the reminants of the platform east of the internal partiotioning wall S35, in the west of S 208.

Only a small part of this building was exposed, no the purpose was to dig foundation trenches for a new large south shelter and be erected in 2002. Due to time pressure working conditions were difficult.

Spaces 208 and 210 together constitute building VII 18.

This space constitutes the main room of building VII-18, that 

 

Number of Related Diary Entries: 0

Conservation Recorded: No

Feature Numbers Related to this Space: (Click to view the record)

834 (wall)
835 (wall)
837 (fire installation)
 
1117 (burial)
1118 (burial)
 
1119 (burial)
1120 (cache/hoard)
 
 
No. Of Units in this Space: 27  (Click to view unit list)