Space Number: 242
Area: North
Within Building Number:
Phasing:
Mellaart Level: Unassigned at present
Hodder Level: North.G
Additional Phase Info: Central group of related buildings based on combination of stratigraphy (abutting relationships) and lithics assemblage dominated by East Gollu dag bifaces and percussion blades.
Midden sequence Sp.242 is part of Sp.279 that comprises multiple sub phases associated with buildings to north and south.
Prior to the introduction of the Hodder phases Sp.242 had been allocated to Mellaart Level V-IV very crudely based on comparison of the material assemblage
but
Mellaart levels of buildings/spaces NOT excavated in the 1960s have been removed to allow an independent assessment on phasing.
NB/Work in progress. Correct as of date entered or modified.
Number of Related Diary Entries: 0
Conservation Recorded: Yes
Sorry this data is not available online yet, please contact us