Space Number: 259
Area: South
Within Building Number:
Phasing:
Mellaart Level: Unassigned at present
Hodder Level: South.R
Additional Phase Info: Main spine. This space is part of the stratigraphic spine that forms the dating project sequence. The spine has been derived by direct stratigraphic relations as far as possible but does include some abutting relationships.
Space 259 is below + (top of mound, erosion and topsoil). It accrues against the east wall of B.42 therefore later than B.42 construction but contemporary with its use.
Prior to the introduction of the Hodder phases Sp.259 had been allocated to Mellaart Level V and a review of the phasing (S.Farid Archive Report 2008) had placed the phasing as more akin to Level III.
but
Mellaart levels of buildings/spaces NOT excavated in the 1960s have been removed to allow an independent assessment on phasing.
NB/Work in progress. Correct as of date entered or modified.Pre 2009