Space Number:  62

Area: North  

 

Within Building Number: 101 

 

Phasing:
Mellaart Level: Unassigned at present 

Hodder Level: North.?G 

Additional Phase Info: ?G grouped with 4040 G on basis that northern sector of 4040 appears to be earlier than southern sector (4040.H), although lithics assemblage indicated ?4040.H (assemblage dominated by Nenezi dag pressure flaked blades) Phasing based on excavated sequence in FT 24, beam slot 23-24 & beam slot 24-25 only. 

 

Description:
Defined in 1993-94 Scrape to North of East Mound. Unexcavated

Largely unexcavated. Foundation Trenches 23-25 cut through Sps 28 and 63 which are part of same building, also incorporates unexcavated rooms Sp.64, Sp.62, Sp.27 all defined on 1993-4 Scrape Plan. Lies west of B.1. East 1/4 within 4040 shelter which may be excavated one day (SF 05/05/11). 

 

Number of Related Diary Entries: 0

Conservation Recorded: No

Feature Numbers Related to this Space:

none 
No. of Units in this Space: 0 

<< BackDownload this Spaces Data

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell