|
Area: South |
|
Dug in Year: 2006 |
Feature Type: platform |
Feature Subtype: |
|
Location: Sw of building 65 |
|
Early platform located in the southwest corner of building 65. The eastern edge of this platform was constructed further to the west than its successor [F2075] and was covered with plaster surface (12843), an earlier plaster surface and make up were apparent within this lower platform phase, these lain over construction deposit (12861). |
|
In situ Conservation: No |
Lifted: No |
|
Feature Relationships: |
abutted by: (Click to view the record) 2075 |
below: (Click to view the record) 2063 |
|
Number of Related Diary Entries: 1 |
|
Conservation Recorded: No |
Buildings: (Click to view the record)
| Spaces: (Click to view the record)
| No. Of Units in this Feature: 4 (Click here to view unit list) |
|