The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Building: 120

Page 1 of 1 (Total Records: 2)
Name: Allison Mickel 
Team:  
Date: 7/16/2013 
Entry: Come on, wall f.7150, why you gotta play me like that? I thought you made sense. Mateusz and I followed your north face down, lovingly. We even found your weird little arm, mini-wall things. We found where you met with the floor f. 7153 and kept you gu... click here for more... 
 
Name: Allison Mickel 
Team:  
Date: 7/19/2013 
Entry: We have finally completed our removal of building 120-- the building in the south half of our trench which was built into a huge terracing cut [30229]. It feels really great, we've made noticeable change in our trench and are beginning to dig into the ma... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell