Displaying Diary Entries for Building: 120 | Page 1 of 1 (Total Records: 2)
| Name: | Allison Mickel | Team: | | Date: | 7/16/2013 | Entry: | Come on, wall f.7150, why you gotta play me like that?
I thought you made sense. Mateusz and I followed your north face down, lovingly. We even found your weird little arm, mini-wall things. We found where you met with the floor f. 7153 and kept you gu... click here for more... | | Name: | Allison Mickel | Team: | | Date: | 7/19/2013 | Entry: | We have finally completed our removal of building 120-- the building in the south half of our trench which was built into a huge terracing cut [30229]. It feels really great, we've made noticeable change in our trench and are beginning to dig into the ma... click here for more... | |
|
|