The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Building: 126

Page 1 of 1 (Total Records: 3)
Name: PAB 
Team:  
Date: 8/25/2013 
Entry: Today we continued preparation and cutting down space 525. We were finally able to completely uncover the plaster line which showed us the new building 126 dimensions. The building includes a buttress and had several floors which been cut in previous exca... click here for more... 
 
Name: JMR 
Team:  
Date: 8/26/2013 
Entry: This is a dairy for 25th August – the last excavation day in Trench 5 for this season – and forever. DSE in Space 310 removed the marl lumps he uncovered in removing layer 31232 and during removal confirmed that the marl did not form constructed featur... click here for more... 
 
Name: JMR 
Team:  
Date: 8/29/2013 
Entry: For the last four days, we have been working on trench closing tasks. Cleaning, taking millions of photos, taking a few last samples, dismantling the tent, taking more pictures, also from a cherry picker, finishing documentation and finds sorting. Today, ... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell