The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Building: 45

Page 1 of 1 (Total Records: 7)
Name: Lisa Yeomans 
Team: Çatal 
Date: 7/9/2004 
Entry: Yesterday we continued with removing the mixed fill of space 228 which forms the western most room of building 45. This unit (10028) is the first fill of the space that we have taken off without recovering finds of post-Neolithic date suggesting that we a... click here for more... 
 
Name: Karl Harrison 
Team: Forensic 
Date: 7/11/2004 
Entry: Significant remains of charred timbers were preserved in fill over the floor of Building 45. Three of these timber sections appeared to be aligned ina linear fashion, and may represent the remains of a single timber, lying on its side. A fourth timber s... click here for more... 
 
Name: Dan Eddisford 
Team: Çatal 
Date: 7/17/2004 
Entry: Where has my entry gone?Entered By: Dan Eddisford 
 
Name: Lisa Yeomans 
Team: Çatal 
Date: 7/17/2004 
Entry: The past few days we have been continuing in space 228 and I now think that part of a later floor surface survived in the western and northern areas of the space. These and some associated features have now been removed. Last night it rained heavily and t... click here for more... 
 
Name: Lisa Yeomans 
Team: Çatal 
Date: 7/18/2004 
Entry: Today we carried on cleaning out the crawl hole..I just typed out a whole speal and the database deleted it, I'll redo it tomorrowEntered By: Lisa Yeomans 
 
Name: Lisa Yeomans 
Team: Çatal 
Date: 7/19/2004 
Entry: Contining from yesterday I started removing the fill of space 238 [10051]. This space was revealed by the presence of a crawl hole in building 45 and the presence of plaster lining on both sides of the western mud brick wall of space 228. The crawl hole a... click here for more... 
 
Name: Lisa Yeomans 
Team: Çatal 
Date: 7/26/2004 
Entry: Contining from yesterday I started removing the fill of space 238 [10051]. This space was revealed by the presence of a crawl hole in building 45 and the presence of plaster lining on both sides of the western mud brick wall of space 228. The crawl hole a... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 