Displaying Diary Entries for Feature = 2456 |
Page 1 of 1 (Total Records: 7)
|
Name: | Naoise Mac Sweeney |
Team: | West-Buffalo/Camb |
Date: | 8/6/2006 |
Entry: | The arbitrary sounding area is finally all finished, with a plan and section drawn. Also went over the paperwork to make sure all the various units linked up - there are so many! Just check out the unit list below. And there are no feature numbers because... click here for more... |
|
Name: | Christoph Skowranek Doru |
Team: | West-Buffalo/Camb |
Date: | 8/6/2006 |
Entry: | After having a nice Trip to Can Hasan and Taskale we started digging today. It was extremely hot, at the moment every day seems to be hotter than the day before.
In trench 6 today missed the team from Selcuk university, who had a seminar day today.
W... click here for more... |
|
Name: | Christoph Skowranek Doru |
Team: | West-Buffalo/Camb |
Date: | 8/7/2006 |
Entry: | Another day of excavation. Today it was not so hot, cause we had a little wind coming under the shelter.
To finish the excavation there is a horrible mass of work to do. not only the excavation work, we are also forced to finish all units we decided to w... click here for more... |
|
Name: | Naoise Mac Sweeney |
Team: | West-Buffalo/Camb |
Date: | 8/7/2006 |
Entry: | W're just about on track for getting everything finished this week. Tom is finishing off his plaster floor, and the graves are under control. Scott has finished his grave, am almost done with mine (F2456 - just planning the stones left), the Selcuk girls ... click here for more... |
|
Name: | ER |
Team: | West-Buffalo/Camb |
Date: | 8/7/2006 |
Entry: | Team: all except Sedef, Mustafa and Serkan sent to east mound, Peter back after breakfast
Weather: extremely hot
In Trench 5, Seliha exposed what is left of skeleton 13778 using unit 13780 for the undisturbed soil around the lower body, in grave 2404 ... click here for more... |
|
Name: | Naoise Mac Sweeney |
Team: | West-Buffalo/Camb |
Date: | 8/8/2006 |
Entry: | Finished plans and elevation sketches to finally finish up graves F2454 and F2456. Its good they're now closed and done with. Did some organising of what unit sheets we have and what needs to be typed up, so we can keep track of what needs to be done and ... click here for more... |
|
Name: | Christoph Skowranek Doru |
Team: | West-Buffalo/Camb |
Date: | 8/8/2006 |
Entry: | Windy day today, not so hot, workable weather.
In Trench 6 the work is still going on, but just the Features next to the southern Trenchedge (F2454, F2456) were today finished, thanks to Naoise, who did a great job!
Helen finally exposed the skeleton (1... click here for more... |
|
|