The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Feature = 287

Page 1 of 1 (Total Records: 2)
Name: Craig Cessford 
Team: Çatal 
Date: 4/15/1999 
Entry: Craig 15-4-99 Escaped the south-west corner and moved to the south-east. Discovered that way back in 1997 Roddy hadn’t properly bottomed post retrieval pit [2712]. He removed the main fill (2711) but not a lower plaster fill (4141) and a bone cluster i... click here for more... 
 
Name: Craig Cessford 
Team: Çatal 
Date: 4/20/1999 
Entry: Craig 20-4-99 Continuing in space 117. Various things removed and it looks like we are getting down to the very earliest deposits. Removed platform F.292 in the north-west corner, fairly mundane and boring. It seals floor (4165) which can probably be e... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell