The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Feature = 30

Page 1 of 1 (Total Records: 3)
Name: Roger Matthews 
Team: Çatal 
Date: 9/12/1996 
Entry: All going well - for the first time it looks like we really will complete the excavation of Building 1 this season. Today's work: Engin, Mehmet and I excavated floors in Space 70 reaching ashy levelling material all over except for under platform 16 where... click here for more... 
 
Name: Roger Matthews 
Team: Çatal 
Date: 9/14/1996 
Entry: Start of another week on site after a Friday trip to Ivriz and Meke Golu. It has been a very windy day with dust blowing through the tent and into our faces and hair. It is still blowy now but no sign of rain. Excavation proceeds well. Space 70 is not far... click here for more... 
 
Name: Roger Matthews 
Team: Çatal 
Date: 9/15/1996 
Entry: Wind has got up again but it wasn't bad during site hours. We proceeded with excavation of the floors and lower deposits of Building 1. The burials are certainly going to take some time. Tona and Jenis continued to excavate burial 30, taking out the main ... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell