Name: TSK 
Team:  
Date: 8/25/2013 
Entry: A lot of points from the total station were the start of my day. There were many units to be closed and therefore many bottom levels to be taken. After this was finished, I started a small section on the Feature 3385 which GWN excavated before. As it was ... click here for more... 
 
Name: JMR 
Team:  
Date: 8/26/2013 
Entry: This is a dairy for 25th August – the last excavation day in Trench 5 for this season – and forever. DSE in Space 310 removed the marl lumps he uncovered in removing layer 31232 and during removal confirmed that the marl did not form constructed featur... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell