Displaying Diary Entries for Feature = 414 |
Page 1 of 1 (Total Records: 3)
|
Name: | Shahina Farid |
Team: | Field Director |
Date: | 5/1/1999 |
Entry: | The aim at the start of the season, once the original area of excavation was changed, was to finish space 117, building 2 and excavate as much of space 115 so as to release wall 406 to excavate that and make building 7 (shrine 8) safe to work in. Wall 40... click here for more... |
|
Name: | Lucy Hawkes |
Team: | Çatal |
Date: | 4/27/1999 |
Entry: | In the last week I have drawn all the walls in space 159 and taken out walls 414 and 400. Wall 400 came down onto a layer which looks like brick although in elevation it appeared to be fill. There also appears to be another wall below 414 and running pa... click here for more... |
|
Name: | Lucy Hawkes |
Team: | Çatal |
Date: | 4/27/1999 |
Entry: | In the last week I have drawn all the walls in space 159 and taken out walls 414 and 400. Wall 400 came down onto a layer which looks like brick although in elevation it appeared to be fill. There also appears to be another wall below 414 and running pa... click here for more... |
|
|