Displaying Diary Entries for Feature = 416 |
Page 1 of 1 (Total Records: 4)
|
Name: | Charlie Newman |
Team: | Çatal |
Date: | 4/26/1999 |
Entry: | Building 6 Space 163
With the 1960’s backfill removed a series of truncated features have now become apparent. The area was immediately planned and placed within the confines of the current grid. In the south-east corner there appears to be an excava... click here for more... |
|
Name: | Charlie Newman |
Team: | Çatal |
Date: | 5/4/1999 |
Entry: | Things seem to be going very well in Space 163. Platform 424 seems to be sorted. It appears that it was constructed over earlier features and floors. Although the platform was heavily truncated during the 60’s (peace love) it seems that there was a post-... click here for more... |
|
Name: | Peter Boyer |
Team: | Çatal |
Date: | 5/3/1999 |
Entry: | Peter Boyer 3rd May 1999
Its now six days since my last entry, and I have spent the intervening period working in Building 6, Space 163. Initially this involved the removal of floor make-up layers (4253, 4259) and a slumped floor deposit (4273) in an ... click here for more... |
|
Name: | Charlie Newman |
Team: | Çatal |
Date: | 5/16/1999 |
Entry: | I have now completed the excavation and recording of the Fire Installation F.416. There were further later phases to this oven, encountered as I excavated to the cut. The oven was very well constructed and has three identifiable ‘use’ phases. There is als... click here for more... |
|
|