Name: Roddy Regan 
Team: Çatal 
Date: 8/31/1997 
Entry: The season began much as we left off last year, taking space 117 in building 2 down in large spits or units ranging between 1000 and 2000 litres. We were aware that discrete dumps were perhaps being missed within the overall dumping process backfilling t... click here for more... 
 
Name: Shahina Farid 
Team: Field Director 
Date: 9/15/1997 
Entry: Its been too long since I last entered my diary and too much has happened to recap on specifics so I might just ramble on for a bit. I have to say losing some diary entries was demoralising specially as time is so tight. The power problem has been a real... click here for more... 
 
Name: Shahina Farid 
Team: Field Director 
Date: 9/21/1996 
Entry: At this stage of play we're pretty certain we're not going to reach floor level in 117 and its a concern to everyone that the walls will suffer if we continue to empty the building. We therefore had a brief strategy meeting with Ian on site this morning,... click here for more... 
 
Name: Shahina Farid 
Team: Field Director 
Date: 9/28/1996 
Entry: Last diary entry for this season. We spent much of this week recording sections and walls as well as taking down walls that were not going to survive the following year. Space 117 is at a 1.2m depth from the N wall, the void in the centre of the room h... click here for more... 
 