The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 15352

Page 1 of 1 (Total Records: 2)
Name: JMR 
Team:  
Date: 7/19/2011 
Entry: We are moving pleasingly fast in the trench extension of Trench 5. The only limiting factor to the speed of the excavation is the soil sieving, so we are currently working on three sieves. JHB and RHB finished U.15351 over Space 454. They went down to th... click here for more... 
 
Name: JMR 
Team:  
Date: 7/20/2011 
Entry: DLG and PTW finished U.15349, which differs from the other topsoil layers on roughly the same level (15350, 15351) because it contains building materials such as dark grey brick, plaster, lime, burnt red brick and lumps of pale yellow clay. Most of these ... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell