Displaying Diary Entries for Unit: 15352 | Page 1 of 1 (Total Records: 2)
| Name: | JMR | Team: | | Date: | 7/19/2011 | Entry: | We are moving pleasingly fast in the trench extension of Trench 5. The only limiting factor to the speed of the excavation is the soil sieving, so we are currently working on three sieves.
JHB and RHB finished U.15351 over Space 454. They went down to th... click here for more... | | Name: | JMR | Team: | | Date: | 7/20/2011 | Entry: | DLG and PTW finished U.15349, which differs from the other topsoil layers on roughly the same level (15350, 15351) because it contains building materials such as dark grey brick, plaster, lime, burnt red brick and lumps of pale yellow clay. Most of these ... click here for more... | |
|
|