The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 15368

Page 1 of 1 (Total Records: 3)
Name: JMR 
Team:  
Date: 7/25/2011 
Entry: Today DLG, while also doing a great job on the total station, finished his arbitrary layer of topsoil/disturbed soil U.15358 west of Sp.342 and 343. Tomorrow he will clean the planum to see in plan features that we can already see in the sections, includi... click here for more... 
 
Name: JHB 
Team:  
Date: 7/25/2011 
Entry: Working in Space 342, taking down unit 15359 (an approx. 30 cm deep level) to the same depth as the base of 342 reached in previous years. Along the southern end of the unit, directly in front of the western buttress, a cluster of pottery was discovered. ... click here for more... 
 
Name: JMR 
Team:  
Date: 8/9/2011 
Entry: We are preparing towards the end of the field season this year, and so far all spaces and excavation areas seem to come to a smooth and logical end ... let’s hope nothing unexpected (burials, gold, ovens) will happen in the next days! DKK drew Space 34... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell