The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 16974

Page 1 of 1 (Total Records: 3)
Name: Jana Rogasch 
Team:  
Date: 7/17/2012 
Entry: Starting Excavation in West Mound Trench 5 this season. We arrived Friday 13th July and have been cleaning the trench from sand bags and soil until yesterday, when we started excavating after breakfast. Aim of this season is to remove those buildings w... click here for more... 
 
Name: GWN 
Team:  
Date: 7/30/2012 
Entry: Today I started to work on removal of new buttress (F. 3326) which as unit (16974) was opened much before. As it was defined during the excavation of building 98 the next step was to remove it in order to understand its construction i.e. how it was built ... click here for more... 
 
Name: JMR 
Team:  
Date: 7/30/2012 
Entry: SO and EUR finished taking out the compact uppermost layer of room fill in southern Building 105 (16997) until coming down to softer fill which will be taken out with a new unit number. During the fill removal, EUR uncovered the long expected southern but... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell