Displaying Diary Entries for Unit: 17290 |
Page 1 of 1 (Total Records: 3)
|
Name: | GWN |
Team: | |
Date: | 8/12/2012 |
Entry: | The clearance of the western wall continues, particularly on the unit 17290. The bottom level of compact soil was today’s goal so we had new insight after its removal. This level was much different from any of those above. It had different type of fill co... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/12/2012 |
Entry: | KTX worked further on clarifying the brick work in the area wall F.5058 meets buttress F.3301. This area, as already expected, is quite complicated. The wall makes a slight bend here, and also was connected to the buttress, so we expected brick laying to ... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/13/2012 |
Entry: | Today we had a lot of action in the trench, as five students from Southampton University are joining us for three days.
Three of them were working with DLG, moving a lot of soil in Building 107 (16988), uncovering features and finding loads of artefact... click here for more... |
|
|