The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 17290

Page 1 of 1 (Total Records: 3)
Name: GWN 
Team:  
Date: 8/12/2012 
Entry: The clearance of the western wall continues, particularly on the unit 17290. The bottom level of compact soil was today’s goal so we had new insight after its removal. This level was much different from any of those above. It had different type of fill co... click here for more... 
 
Name: JMR 
Team:  
Date: 8/12/2012 
Entry: KTX worked further on clarifying the brick work in the area wall F.5058 meets buttress F.3301. This area, as already expected, is quite complicated. The wall makes a slight bend here, and also was connected to the buttress, so we expected brick laying to ... click here for more... 
 
Name: JMR 
Team:  
Date: 8/13/2012 
Entry: Today we had a lot of action in the trench, as five students from Southampton University are joining us for three days. Three of them were working with DLG, moving a lot of soil in Building 107 (16988), uncovering features and finding loads of artefact... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell