The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 18367

Page 1 of 1 (Total Records: 5)
Name: GWN 
Team:  
Date: 8/18/2012 
Entry: Work on two opposite parts of building 98 was on excavation menu today. The first half of the day I spent helping JHB in digging and defining the northern half of western wall. I was working at the corner of this wall and the northern one, trying to defin... click here for more... 
 
Name: GWN 
Team:  
Date: 8/19/2012 
Entry: In the morning the clay balls were still on the same spot (18367) in the building 98:-) Fortunately no one visited the site during the night in order to get richer for couple of clay balls. So, I continued with the deciphering the rounded mystery next to ... click here for more... 
 
Name: JMR 
Team:  
Date: 8/8/2013 
Entry: This is a diary for the 6th and 7th August. Currently we are on a 3-day Bayram excavation break, there is no work being done in the trench on the 8th, 9th (Friday anyway) and 10th August. TET and DAB started removing room fill layer 31127 in Space 310.... click here for more... 
 
Name: JMR 
Team:  
Date: 8/11/2013 
Entry: Finally excavating again. All that sitting in the office is too much. In B.107, we continued what we started. CMP drew the wall succession F.3373-3304-2426, with the fill between F.3373 and F.3304 being really clear, but F.3373 itself rather fuzzy towa... click here for more... 
 
Name: CLC 
Team:  
Date: 8/26/2013 
Entry: 07-08-2013 Today we began with scraping the southeast quadrant of building 98 in order to better understand whether the layer between the first floor (16977) and second floor is present. After scrape, the majority of the area appears to be the same lig... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 