Displaying Diary Entries for Unit: 2202 | Page 1 of 1 (Total Records: 2)
| Name: | Mira Stevanovic | Team: | Bach | Date: | 8/13/1997 | Entry: | AUGUST
10 (S): Beginning the excavation. Scraping
11 (M): Scraping
12 (Tu): Drawing. Establishing the grid for the excavation
13 (W): Opening units 2200, 2201, 2202, 2203, 2204, 2205Entered By: Mira Stevanovic | | Name: | Ruth Tringham | Team: | Bach | Date: | 8/16/1997 | Entry: | Today we finished excavating the first arbitrary level of building fill in space 86. Ivan draws it (97/201).
Start excavating second arbitrary level of building fill in space 86 (except SE corner), now that we know (see last Thurs) that the wall plaster... click here for more... | |
|
|