The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 31127

Page 1 of 1 (Total Records: 4)
Name: DAB 
Team:  
Date: 8/7/2013 
Entry: Today and yesterday I joined Trench 5 if the West Mound to experience the work and materials in the site, as a complement to my work in the pottery lab. On 06/08/2013, the day started by a quick tour through different units. In Building 98 I was able ... click here for more... 
 
Name: JMR 
Team:  
Date: 8/8/2013 
Entry: This is a diary for the 6th and 7th August. Currently we are on a 3-day Bayram excavation break, there is no work being done in the trench on the 8th, 9th (Friday anyway) and 10th August. TET and DAB started removing room fill layer 31127 in Space 310.... click here for more... 
 
Name: JMR 
Team:  
Date: 8/11/2013 
Entry: Finally excavating again. All that sitting in the office is too much. In B.107, we continued what we started. CMP drew the wall succession F.3373-3304-2426, with the fill between F.3373 and F.3304 being really clear, but F.3373 itself rather fuzzy towa... click here for more... 
 
Name: TET 
Team:  
Date: 8/12/2013 
Entry: Today I took the bottom levels of unit 31127. This unit is closed now. Afterwards myself and DSE helped PAB removing the backfill of space 448. It took us several hours to finish. More or less we spent the whole day preparing the space for excavation. Lat... click here for more... 
 