The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 31175

Page 1 of 1 (Total Records: 2)
Name: NMR 
Team:  
Date: 8/13/2013 
Entry: Yippee, unit 31142, on the surface of B106, connects to the wall F5058! That was the nice result of this morning. I started by removing the fills 31153+31156 together and sampled them. Then I realized that the supposed in-between fill and plaster 31151 an... click here for more... 
 
Name: NMR 
Team:  
Date: 8/14/2013 
Entry: Today I removed the plaster 31142 that was remaining on the hill's slope. Under it was the fill 31175, sometimes very thick and sometimes unexistent, that looks quite disturbed to me, mayb mimit hole or crack in the plaster. This showed me that the plaste... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell