Name: JMR 
Team:  
Date: 8/20/2013 
Entry: Today was a day of new discoveries. In Space 448, TET and PAB scraped the bottom some more after finishing the big fill layer 31169 yesterday. After that, we saw two spots that very certainly were buttresses, even though they are still fuzzy at this le... click here for more... 
 
Name: JMR 
Team:  
Date: 8/23/2013 
Entry: This is for 22.8. TET set off to make the long eastern profile in Space 448 presentable and in doing so found another construction feature, in the place where we suspected we might find the northern buttress. Its mud brick and mortar lines are visible ... click here for more... 
 
Name: GWN 
Team:  
Date: 8/24/2013 
Entry: This is one of the last days for excavation so we are finishing the work in the small sondage bellow the building 98. After closing the 31214 and opening 31227 and 31218, as well as the feature 3387, we determined the earliest building so far in the Tre... click here for more... 
 
Name: GWN 
Team:  
Date: 8/25/2013 
Entry: Today is the last excavation day so we had to finish the digging and clearing of our units. Surely it was not possible to close them, neither to explore the buildings in total, especially not the building 125. From Tuesday on, the site will be backfilled ... click here for more... 
 