Displaying Diary Entries for Unit: 3178 |
Page 1 of 1 (Total Records: 2)
|
Name: | Richard Turnbull |
Team: | Çatal |
Date: | 8/5/1998 |
Entry: | 5/8/98
Excavated plaster layer [ 3159]. BM. Came up took samples for chemical analysis on section on N. side of trench through backfill and platform material. Discussed taking samples of occup. Deposit partially visible at present once it has been fully ... click here for more... |
|
Name: | Richard Turnbull |
Team: | Çatal |
Date: | 8/6/1998 |
Entry: | 6/8/98 Assume excavated [3178] - planned 3 units - one occupation deposit layer associated with platform - [3184] and 2 small patches of brown silt material [3183] and [3182].Excavated [3184] and [3183].Entered By: Richard Turnbull |
|
|