Displaying Diary Entries for Unit: 3228 |
Page 1 of 1 (Total Records: 4)
|
Name: | Åsa Berggren |
Team: | Çatal |
Date: | 8/9/1998 |
Entry: | This is a continuation of my general impressions. The sense of a dividing line between specialists and excavators is stronger than I first imagined. I thought it was just me not being used to the situation. But after the meetings discussing the methodolog... click here for more... |
|
Name: | Åsa Berggren |
Team: | Çatal |
Date: | 8/17/1998 |
Entry: | Space 156:
The fallen part of the western wall is now excavated and it did rest on the trampled surface below at the southern end. An accumulated deposit (may also be partly dumped at the northern end, unit numbers 3228, 3241, 3242, 3243) is under the wa... click here for more... |
|
Name: | Åsa Berggren |
Team: | Çatal |
Date: | 9/1/1998 |
Entry: | In space 156 work with the walls have continued. About the western wall (F227) and the inner support (3298) I got some feed back from the specialists during the priority tour today. I made the picture more complicated I'm afraid. The question is how the l... click here for more... |
|
Name: | Åsa Berggren |
Team: | Çatal |
Date: | 9/10/1998 |
Entry: | Åsa 10-9
Last diary entry.
The blocking (F249) between space 156 and 157 in building 5 has now been removed. It consisted of a nice little row of bricks and mortar (units 3881 and 3882). Another material (3880) was put against its northern face maybe ... click here for more... |
|
|