Feature 2605

Area: South 
 
Dug in Year: 2007 
Feature Type: other 
Feature Subtype:  
 
Location: SE corner, within ladder base F2094 
 
Grid X: 937  Grid Y: 957.9
 
Pottery vessel inserted in to floors and construction of building 65 at ladder base. When the vessel was lifted it appeared tp have been pushed in on itself / crushed, as seen in reconstruction on feature sheet, its lips would have been above the floors. This is evidenced by the lipping of the plaster floor on the vessel's body. 
 
In situ Conservation: No 
Lifted: No 
 
Feature Relationships:
contained by: (Click to view the record) 2094 
 
Number of Related Diary Entries: 0
Conservation Recorded: No
Buildings: (Click to view the record)

65 
Spaces: (Click to view the record)

297 
No. Of Units in this Feature:  2  (Click here to view unit list)
<< BackDownload this Features Data

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell