When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 2148 | Page 1 of 1 (Total Records: 5)
| Sample No. | Type | Amount | Comment | Unit: 2148 | 1 | Flotation-routine | 30 | Sample Amount was 30L updated to purely numeric value 28th July 2009. Original entry of 30 replace | 2 | Archive | 0.25 | Sample Amount was 250 ml updated to 0.25 28th July 2009 | 3 | Architecture | | architectural. Sample type changed from architectural to Architecture 29/08/09. SAJ - unable to tran | 4 | Architecture | | architectural core. Sample type changed from architectural core to Architecture 29/08/09. SAJ - unab | 5 | Architecture-subsample | | Subsample S2. Sample amount entered as 50 g removed from amount field as is a sub sample 25/08/09, S |
|
|
<< Back | Download these Samples |