Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 2148

Page 1 of 1 (Total Records: 5)
Sample No.TypeAmountComment
Unit: 2148 
Flotation-routine 30  Sample Amount was 30L updated to purely numeric value 28th July 2009. Original entry of 30 replace 
Archive 0.25  Sample Amount was 250 ml updated to 0.25 28th July 2009 
Architecture  architectural. Sample type changed from architectural to Architecture 29/08/09. SAJ - unable to tran 
Architecture  architectural core. Sample type changed from architectural core to Architecture 29/08/09. SAJ - unab 
Architecture-subsample  Subsample S2. Sample amount entered as 50 g removed from amount field as is a sub sample 25/08/09, S 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell