Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 23066

Page 1 of 1 (Total Records: 3)
Sample No.TypeAmountComment
Unit: 23066 
Archive 0.5 Lifted in block like a micromorph sample 
Flotation-routine Plaster from Sp. 504 
Flotation-routine 15 Plaster from Sp. 500 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell