Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 2880

Page 1 of 1 (Total Records: 3)
Sample No.TypeAmountComment
Unit: 2880 
Archive 0.5  Sample Amount was 0.5 L updated to purely numeric value 28th July 2009 
Flotation-routine  Sample Amount was 15 L updated to purely numeric value 28th July 2009. Original entry of 15 replac 
Architecture-subsample  Composition - subsampled from S1 SHL 07. Sample amount entered as c. 50g removed from amount field a 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell