Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 5132

Page 1 of 1 (Total Records: 5)
Sample No.TypeAmountComment
Unit: 5132 
Archive 0.5 Routine 
Flotation-routine 25 Routine Sample Amount was 25 L updated to purely numeric value 28th July 2009 
Architecture-subsample  Composition - Sub-sampled from archive for analysis. BT VII/06. Sample amount entered as 71 g remove 
Organic Residue-subsample  from archive s 1 for organic residue analysis of Fis; 9.9g; 1/8/2010 SK 
Botanics-phytoliths 0.02 Subsample of s1 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell