When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6121 | Page 1 of 1 (Total Records: 7)
| Sample No. | Type | Amount | Comment | Unit: 6121 | 1 | Flotation-routine | 37 | standard Sample Amount was 38l updated to purely numeric value 28th July 2009. Original entry of 38 | 2 | Archive | 0.5 | standard Sample Amount was blank, updated to half a litre (0.5) 28th July 2009 | 3 | Botanics-phytoliths | | floor | 4 | Chemical Analysis-phosphate | | phosphate - floor | 5 | Chemical Analysis-ICP | | floor | 6 | Botanics-phytoliths | | wall/floor junction | 7 | Flotation-routine | 3 | black in SE corner. Original entry of 2L. replaced by volume for sample from Flot Log 19/08/09. Flot |
|
|
<< Back | Download these Samples |