When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6166 | Page 1 of 1 (Total Records: 9)
| Sample No. | Type | Amount | Comment | Unit: 6166 | 1 | Flotation-routine | 18.8 | standard Sample Amount was 16L updated to purely numeric value 28th July 2009. Original entry of 16 | 2 | Archive | 0.75 | standard Sample Amount was envelope or env. updated to 0.75 litre 28th July 2009 | 3 | Botanics-phytoliths | 0.02 | standard. Sample amount originally entered as 20 g translated to 0.02 litres 27/08/09. | 4 | Chemical Analysis-phosphate | 0.02 | stndard. Sample amount originally entered as 20 g translated to 0.02 litres 27/08/09 | 5 | Chemical Analysis-ICP | 0.02 | standard. Sample amount originally entered as 20 g translated to 0.02 litres 27/08/09 | 6 | Building material | | standard. SAJ - unable to translate sample amount into numeric figure (litres), not enough informati | 7 | Plasters-painted | 0.5 | painted in red. Sample Type changed from painted plaster to Plasters-Painted, sample type originally | 8 | Flotation-routine | 0.5 | Sample Amount was 0.5L updated to purely numeric value 28th July 2009 | 9 | Flotation-routine | 1 | Sample Amount was 2L updated to purely numeric value 28th July 2009. Original entry of 2 replaced |
|
|
<< Back | Download these Samples |