When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are
placed in special containers and labelled. These samples are saved for analytical purposes and are used
by the Specialists on the site to discover more about the activity and the environment surrounding the Unit
when it was exposed.
Displaying Sample Numbers in the Unit: 6178 | Page 1 of 1 (Total Records: 4)
| Sample No. | Type | Amount | Comment | Unit: 6178 | 1 | Flotation-routine | 37.5 | standard Sample Amount was 15L updated to purely numeric value 28th July 2009. Original entry of 15 | 2 | Plasters-painted floor plaster | | plaster painted - color. SAJ - unable to translate sample amount into numeric figure (litres), not e | 3 | Archive | 0.005 | Sample amount originally entered as: trowel replaced by numeric value 0.005 litres 18/08/09 | 4 | Fauna-other | | bird f36 |
|
|
<< Back | Download these Samples |