Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 6178

Page 1 of 1 (Total Records: 4)
Sample No.TypeAmountComment
Unit: 6178 
Flotation-routine 37.5 standard Sample Amount was 15L updated to purely numeric value 28th July 2009. Original entry of 15 
Plasters-painted floor plaster  plaster painted - color. SAJ - unable to translate sample amount into numeric figure (litres), not e 
Archive 0.005 Sample amount originally entered as: trowel replaced by numeric value 0.005 litres 18/08/09 
Fauna-other  bird f36 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell