Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.

Displaying Sample Numbers in the Unit: 6693

Page 1 of 1 (Total Records: 10)
Sample No.TypeAmountComment
Unit: 6693 
Archive 0.5 standard Sample Amount was 1/2 envelope updated to 0.5 litre 28th July 2009 
Flotation-routine 60 standard Sample Amount was 80L updated to purely numeric value 28th July 2009. Original entry of 80 
Flotation-routine standard (split because of size) Sample Amount was 20L updated to purely numeric value 28th July 20 
Botanics-phytoliths  basket in burial 
Flotation-routine standard (taken later) Sample Amount was 5l updated to purely numeric value 28th July 2009. Origina 
cancelled   
Flotation-routine 16 cleaning sides Sample Amount was 15 L updated to purely numeric value 28th July 2009. Original entr 
Flotation-routine cleaning sides (later sample) Sample Amount was blank, this has been imported from Bots 28th July 20 
Fauna-other  x3 subsample 2012 mv 
10 Fauna-other  fish subsample from s2 flot 4463 

Page: [1 ]

 
<< BackDownload these Samples

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell