Space Number:  269

Area: North  

 

Within Building Number: 57 

 

Phasing:
Mellaart Level: Unassigned at present 

Hodder Level: North.H 

Additional Phase Info: Southern group of related buildings based on combination of stratigraphy (abutting relationships) and lithics assemblage dominated by Nenezi dag pressure flaked blades Exposed to its latest occupation phase the construction of Sp.269 of B.57 is earlier than midden Sp.279. Prior to the introduction of the Hodder phases Sp.269 of B.57 had been allocated to Mellaart Level VI-III very crudely based on comparison of the material assemblage but Mellaart levels of buildings/spaces NOT excavated in the 1960s have been removed to allow an independent assessment on phasing. NB/Work in progress. Correct as of date entered or modified. 

 

Microsoft OLE DB Provider for ODBC Drivers error '80040e37'

[Microsoft][ODBC SQL Server Driver][SQL Server]Invalid object name 'catal_portfolio_copy_for_DB.dbo.FieldDef'.

/library/RetrieveDataFunctions.asp, line 122