Name: Rebecka Erntell 
Team:  
Date: 7/29/2012 
Entry: Life goes on and U20481 disappears in space 17/18. It is not all easy, as these two spaces have been open and run over by wheel barrows for a long time. The walls are fragile, U20481, the infill, is compact and full of well preserved bricks and the differ... click here for more... 
 
Name: Rebecka Erntell 
Team:  
Date: 8/4/2012 
Entry: So, finally time has come for my last field diary entry for the 2012 season. People are going home. The trench owl made its last inspection yesterday evening, the corridors are silent and empty and there is suddenly hot water in the showers and cold water... click here for more... 
 
Name: Stella Macheridis 
Team:  
Date: 6/30/2013 
Entry: Our pod of three (me, Jedrzej and Yunuz) started excavations of B. 102 yesterday, first started the last days of the 2012 season. In S17 a floor level was reached last year, but wasn't found in S18, and not even in a sondage cut they made in the middle of... click here for more... 
 
Name: Burcu Tung 
Team:  
Date: 7/1/2013 
Entry: Work has begun in full blast since the teams arrived on the 25th and 26th of the month. New teams, new students, and a new season. And lots of babies, which is quite refreshing really. I arrived on site on the 19th of June - this is rather a late diar... click here for more... 
 
Name: Stella Macheridis 
Team:  
Date: 7/3/2013 
Entry: Since my last entry I have been doing all sorts of things. But more importantly we have removed some features (1) and started some (2 possibly 3) and cleared out some problematic units in our building, 102. Actually, the clearing out has been balanced by ... click here for more... 
 
Name: Stella Macheridis 
Team:  
Date: 7/9/2013 
Entry: Today we had a really interesting day in the B.102. Well, obviously, every day is interesting in our house, but today we finally can start to see same floor in both spaces, and just not bits and pieces (as it has been in S18). Having said that, it also me... click here for more... 
 
Name: Stella Macheridis 
Team:  
Date: 7/21/2013 
Entry: A floor is a floor is a floor is a floor. Or is it? In Catal, more specifically B.102, a floor layer can be extremely hard to define (although sometimes it will just lay itself out before you, like a very nice rug - this is, as you may already know, a ver... click here for more... 
 
Name: SM 
Team:  
Date: 7/28/2014 
Entry: In the past weeks I have excavated a building (B128), revealed an external space (Sp. 530) roughly contemporary with B102 and B3, and started work on B.102. It is now time to contemplate - where am I and what am I doing and what have I done so far? This f... click here for more... 
 
Name: Sean Doyle 
Team:  
Date: 5/31/2016 
Entry: What the heck is going on in Building 102? This entry is based on the heavy residue backlog from 2013 that I have been processing over the last several weeks (better late than never right?) Everybody has heard me going on and on about prismatic blad... click here for more... 
 