The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Building: 113

Page 1 of 1 (Total Records: 4)
Name: Burcu Tung 
Team:  
Date: 7/1/2013 
Entry: Work has begun in full blast since the teams arrived on the 25th and 26th of the month. New teams, new students, and a new season. And lots of babies, which is quite refreshing really. I arrived on site on the 19th of June - this is rather a late diar... click here for more... 
 
Name: Maciej Chylenski 
Team:  
Date: 7/1/2014 
Entry: We have been excavating building 113 for couple days now and so far it seems that we are basically removing the underground foundation part of younger building that the build on unstable ground (possibly midden). Similarly to neighboring B 108 it seems t... click here for more... 
 
Name: Maciej Chylenski 
Team:  
Date: 7/20/2014 
Entry: Building 113 continues to puzzle us, we got so accustomed to the hypothesis that it was built on a midden (which, in our mind corresponded beautifully with what we saw in Building 108), that finding what seems to be older walls underlying its foundation p... click here for more... 
 
Name: Burcu Tung 
Team:  
Date: 6/23/2016 
Entry: Phasing the 4040 buildings has always been a bit of a nightmare for Shahina. Too much lateral excavation and too little in depth excavation done in an area where we were presumed to document a happy neighborhood ended up showing us that in fact the mound... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell