Displaying Diary Entries for Building: 128 |
Page 1 of 1 (Total Records: 3)
|
Name: | Kate Nelson |
Team: | |
Date: | 7/10/2014 |
Entry: | Towards the end of this week we began removing the outside walls of our space. After removing the infill we realized that they were floating, and likely belonged to an eroded, later building. In some ways it was sad to dismantle these walls - they belonge... click here for more... |
|
Name: | Stella Macheridis |
Team: | |
Date: | 7/15/2014 |
Entry: | We have almost eradicated a building so far (B.128) or rather we are excavating what is below it. Since last entry (too long ago!) we have been occupied with walls and infills, mainly walls. Excavating Catal-walls is something I am not especially familiar... click here for more... |
|
Name: | SM |
Team: | |
Date: | 7/28/2014 |
Entry: | In the past weeks I have excavated a building (B128), revealed an external space (Sp. 530) roughly contemporary with B102 and B3, and started work on B.102. It is now time to contemplate - where am I and what am I doing and what have I done so far? This f... click here for more... |
|
|