The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Feature = 1307

Page 1 of 1 (Total Records: 3)
Name: Roddy Regan 
Team: Çatal 
Date: 7/6/2004 
Entry: Three days on since my last entry (i think?) Anyway things seem to be going well in building 10. Lots of contexts hav been removedç mostly floors below the platforms (phisically below). It looks like Platform F1307 may be released first as the we are... click here for more... 
 
Name: Roddy Regan 
Team: Çatal 
Date: 7/7/2004 
Entry: Rather humid day under the shelter. What stated as a bit of a flap ended fine as we are about the shift some of the platforms or at least eat into them. It appears that what was considerd to be the the east wall and part of the south and north walls of... click here for more... 
 
Name: Richard Turnbull 
Team: Çatal 
Date: 7/7/2004 
Entry: Most humid day under the shelter so far but at least the annoying black midgy things weren't so annoying today. Shahina came up this morning and she'd obviously been mentally chewing over our walls since she pointed out that we'd got walls sitting on top ... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell