Entry: first dairy entry of the 2004 season Richard had already started the exavation when I arrived. The area seemed very clean although much disturbed by later activityç the greek team had already removed the upper sequences within structure 10 this in 1... click here for more... 
 
Name: Richard Turnbull 
Team: Çatal 
Date: 7/4/2004 
Entry: Roddy has pretty well covered what I've got up to so far - apart from the few ephemeral hearth? deposits and eroded floor layers I've been removing the platform extension F.1317 which was releeased by the excavation of floor (8086). F.1317 wasn't in great... click here for more... 
 
Name: Richard Turnbull 
Team: Çatal 
Date: 7/5/2004 
Entry: Jason came up this morning and did the first shot of building 10 in it's entirety since we began excavating this year. Removed a narrow strip of horizontal plaster with red pigment on the surface (10615) that lay along the E.edge of F.1314 & F.1317. This... click here for more... 
 