The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Feature = 1477

Page 1 of 1 (Total Records: 2)
Name: Doru Bogdan 
Team: Çatal 
Date: 7/1/2006 
Entry: I started excavating B51 today. I emptied the niche 1477 in the east wall. It contained two fills 12659 and 12660. The second one was deposited on the bottom of the niche only at the exterior. It could have had a retaining role. I also emptied the post r... click here for more... 
 
Name: Doru Bogdan 
Team: Çatal 
Date: 7/3/2006 
Entry: Today our understanding of B51 changed dramaticly. It is clear now that the east, the north and half of the west wall of B51 are walls of B52 reused in 51. So are the platforms. B51 was constructed by removing the burnt house fill of 52 and constructing... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell