The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Feature = 3391

Page 1 of 1 (Total Records: 4)
Name: TSK 
Team:  
Date: 8/24/2013 
Entry: Once more, I've been sent to a different area of the trench. In the north-eastern part of building 98 there were different orange coloured layers to investigate. The first one was finished very fast, as it was only a small patch, I exposed the outlines an... click here for more... 
 
Name: JMR 
Team:  
Date: 8/24/2013 
Entry: GWN and CLC continued investigating feature and “burnt layer” in the phase under B.98 which now has the working title Building 125! CLC found a corner, so there really is a wall behind the buttress F.3387, of which we do not see the eastern limit. GWN fol... click here for more... 
 
Name: TSK 
Team:  
Date: 8/25/2013 
Entry: A lot of points from the total station were the start of my day. There were many units to be closed and therefore many bottom levels to be taken. After this was finished, I started a small section on the Feature 3385 which GWN excavated before. As it was ... click here for more... 
 
Name: JMR 
Team:  
Date: 8/26/2013 
Entry: This is a dairy for 25th August – the last excavation day in Trench 5 for this season – and forever. DSE in Space 310 removed the marl lumps he uncovered in removing layer 31232 and during removal confirmed that the marl did not form constructed featur... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell