The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 10819

Page 1 of 1 (Total Records: 2)
Name: Bleda During 
Team: Çatal 
Date: 7/13/2004 
Entry: Today we continued excavting subfloor units in two spaces. In space 112 cut 10811 and its fill 10812 were excavated. This is a large ovoid cut whose function cannot be determined. It might cut a skeleton below 10813, but we are not sure. Another cut... click here for more... 
 
Name: Bleda During 
Team: Çatal 
Date: 7/14/2004 
Entry: Excavation proceeded in both spaces 231and 112. In space 231 a second spit of the sub floor construction fill was excavated - unit 10821 which is identical to unit 10819 above. The lower limit of the unit is arbitrary. Like 10819 unit 10821 contained ... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell