Entry: Today, we continued surface scraping work on the two 10mx10m trenches we opened on July 20th after they had been preliminarily staked out for us by the surveyor team. Hopefully the surveyors will provide us with the defintite grid tomorrow morning so we c... click here for more... 
 
Name: Christoph Skowranek Doru 
Team: West-Buffalo/Camb 
Date: 7/22/2006 
Entry: Today was our second day on site, still continue in scraping Trench A and B at the West Mound. I worked in trench A, where we remove the first 10 cm of the topsoil (13701). In this layer there was lots of unstartified potsherds and obsidian. In the southe... click here for more... 
 
Name: Naoise Mac Sweeney 
Team: West-Buffalo/Camb 
Date: 7/22/2006 
Entry: The first diary entry is proving harder than expected. Computer crashing. Wrote one full entry but it didn't save properly and all got lost. Now must run to dinner. Pity. Shovelling. Blisters. However, still excited like a small child. Eyes still bulge... click here for more... 
 
Name: Esra Nigar Irmak 
Team: West-Thrace 
Date: 7/22/2006 
Entry: Sabah saat 7'de bati çatal höyük deki 13701 unit numarali 10*10 metre boyutlarindaki A açmasinda çalismaya basladim. Benim açmamda Eva,Christoph,Nick ve 2 isçi Mustafa ve Metin vardi. Degisimli olarak kazma ve el arabalarina kürek atma islerini beraber ya... click here for more... 
 
Name: Naoise Mac Sweeney 
Team: West-Buffalo/Camb 
Date: 7/23/2006 
Entry: Both west mound trenches now actually looking like trenches, and interesting things going on in both. Very satisfying to see them at the end of the day with neat edges and clean floors. Features are beginning to appear in Trench A, with quite a few scraps... click here for more... 
 
Name: Esra Nigar Irmak 
Team: West-Thrace 
Date: 7/24/2006 
Entry: saat 06 da kazi alanina gidilip ise baslandi. Once fotograf cekimi icin transe 5 ve altinin supurulup temizlenmesi calismalari yapildi. Ben fotograf cekimi icin gerekli olan olculerin beyaz tahtanin alimi icin kazi evine dondum. Temizlenen a ve b transele... click here for more... 
 
Name: Esra Nigar Irmak 
Team: West-Thrace 
Date: 7/25/2006 
Entry: Bugun yine gecen gun oldugu gibi kazi alaninda sabah saat 6 gibi gittim. Yine 5 nolu transede Chiristofh ile beraber calismaya basladik. Transede kuzey dogu yonunde 5*5 metrelik alanda 10 cm daha derine inmeye basladik. Biraz derine inildiginde hemen yan... click here for more... 
 
Name: Gülgün Gürcan 
Team: West-Thrace 
Date: 7/25/2006 
Entry: I could not my diary yesterday due to my sickness. Yesterday I went to trench 6 around 6 clock and worked there till 11 am but I had to stop then. The rest of the day I spent laying in my bed and fasting only drinking salty&sugary water. What I did yester... click here for more... 
 