Displaying Diary Entries for Unit: 13726 |
Page 1 of 1 (Total Records: 8)
|
Name: | Esra Nigar Irmak |
Team: | West-Thrace |
Date: | 7/29/2006 |
Entry: | bugun 6 nolu transenin kuzey batisindaki 13802 nolu uniteki iskeletin kaldirilmasindan sonra genel transe derinliginden 7 cm kadar yuksekte duran 2*2 metrelik bir alani dikkatli sekilde mala kazmaya basladim. Yanimda iscilerden mustafa ve serkan ile kazi ... click here for more... |
|
Name: | ER |
Team: | West-Buffalo/Camb |
Date: | 7/31/2006 |
Entry: | Team: everybody minus Ezra and Helen plus Jonathan and Catriona. Three members of the Selcuk team (Zeliha, Vildan, Nesime) joined us today, and the tent over trench 6 was put up today to provide shelter when the burials there are taken out.
Weather: pret... click here for more... |
|
Name: | ER |
Team: | West-Buffalo/Camb |
Date: | 8/2/2006 |
Entry: | Team: all in the morning, Tom and Helen at the dighouse after lunch, Jonathan and Catriona
Weather: very hot and no wind, good to have the shelter
In Trench 5, Ezra, Gulgun, Gulay and Hanife were engaged in taking off the stones 13722 and thus exposed... click here for more... |
|
Name: | ER |
Team: | West-Buffalo/Camb |
Date: | 8/8/2006 |
Entry: | Team: is there one?
Weather: not as hot as during the last days
Totalstationci: Sedef
Trench 5:
Vildan did a great job exposing the skeleton 13784 in grave 2406 today, using unit 13771 for the grave fill. It has been photographed and is ready for ... click here for more... |
|
Name: | ER |
Team: | West-Buffalo/Camb |
Date: | 8/9/2006 |
Entry: | Weather: pretty hot, and we worked outside until 6 o'clock to manage the graves
With Sedef at the Total Station and Nejat mainly in photography, Zeliha finished excavating grave 2404 and we obtained a date for it (13780) and its disturbance (13781). Vi... click here for more... |
|
Name: | Thomas Birch |
Team: | West-Buffalo/Camb |
Date: | 7/4/2007 |
Entry: | Today was possibly the worse in day of my life as an archaeologist.
Whats happened to my diary entry?Entered By: TEB |
|
Name: | ER |
Team: | |
Date: | 8/5/2008 |
Entry: | Another great day at T5! Weather was pleasant, archaeology fun.
AWH and JJW continued 16898 in space 310. There is a very interesting cluster of big potsherds (unit 17208) abutting the plaster 13726 at the E wall 2427. looks as if people have swept stu... click here for more... |
Sketch: | Click here to open in a new window |
|
Name: | ER |
Team: | |
Date: | 8/15/2008 |
Entry: | My last day in Catal for this year, most of the team has left already. The last few days were mainly spent by documentation and drawing, except in space 310.
After going deeper with unit 17214, a older layer of plaster (unit 17249) underlying 13726 wa... click here for more... |
|
|