The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 13778

Page 1 of 1 (Total Records: 3)
Name: ER 
Team: West-Buffalo/Camb 
Date: 8/6/2006 
Entry: Yesterday, while the Cambridge team was in Cappadocia, the rest of us made a nice trip to the Karaman museum and Can Hasan, where we had a look at French's trenches (unfortunately now used as rubbish dumps) and at the pottery. Today, full team except ... click here for more... 
 
Name: ER 
Team: West-Buffalo/Camb 
Date: 8/7/2006 
Entry: Team: all except Sedef, Mustafa and Serkan sent to east mound, Peter back after breakfast Weather: extremely hot In Trench 5, Seliha exposed what is left of skeleton 13778 using unit 13780 for the undisturbed soil around the lower body, in grave 2404 ... click here for more... 
 
Name: ER 
Team: West-Buffalo/Camb 
Date: 8/8/2006 
Entry: Team: is there one? Weather: not as hot as during the last days Totalstationci: Sedef Trench 5: Vildan did a great job exposing the skeleton 13784 in grave 2406 today, using unit 13771 for the grave fill. It has been photographed and is ready for ... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell