The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 13797

Page 1 of 1 (Total Records: 4)
Name: Naomi Christie 
Team: West-Buffalo/Camb 
Date: 7/1/2007 
Entry: U14239 - area I have been working on with Ros. Photographed it today. Holes are difficult to photograph, because they make their own shade. The thing was eventually two interlinked pits, most likely part of an animal burrow. So anyway, difficult to ph... click here for more... 
 
Name: ER 
Team: West-Buffalo/Camb 
Date: 7/8/2007 
Entry: As agreed upon yesterday, the Selcuk team members now work on their own, supported by Scott who will be out with us during the next two weeks. Only now I realized how much better things work out in the EC structures if I can really be with our team and ha... click here for more... 
Sketch: Click here to open in a new window
 
Name: KTX 
Team:  
Date: 8/2/2012 
Entry: The past day have involved the removal of more brick material belonging to B.106. The material of wall F.2427 (Mud-brick U.13797 & U.17254, Mortar U.13755, Plug Plaster U.17255) was completely removed and sampled. The transitional-plastering layer (U.1699... click here for more... 
 
Name: KTX 
Team:  
Date: 8/9/2012 
Entry: During the excavation of buttress F.3301 (mud-bricks U.16994) it became apparent that many medium sized potsherds were located between the brick layers, stuck in the mortar used to bond the bricks. Also several stones of similar size were visible. Possibl... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell